Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

February 18, 2025

Multiple Locations

Renovation

No Information to Display

$150,000.00

Public - City

img_map_placeholder

Multiple Locations, Ayer, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe to View Full Documents

The Ayer Department of Public Works (DPW), the Awarding Authority, invites sealed bids from Massachusetts Licensed Electrical contractors to install two (2) new generator connections at various locations for the Ayer DPW in Ayer, Massachusetts, in accordance with the documents prepared by the Ayer DPW. General bids shall be accompanied by a bid deposit that is not less than five percent (5%) of the greatest possible bid amount. The successful General Bidder must furnish a fifty percent (50%) Payment Bond with a surety company acceptable to the Owner. Questions concerning this IFB or to schedule a site visit please contact Kimberly Abraham at kabraham@ayer.ma.us or 978-772-8240. The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest. Project Description: The successful bidder shall provide a list of labor and materials needed to complete the following work in the Ayer Wastewater Pump Stations. Installation of generator manual three-way switches and plug / camlock / cam-type interconnections for two (2) wastewater pumpstations and supply of cam-type connector or cord set for utilization of mobile emergency generator. Interconnectivity is necessary between cord / camlock / cam-type sizing and switch sizing between the stations with one cord set or set of cam lock cables for all stations. Utilization of cord / cam-type connectors must be easily identifiable for use. Sizing of the cam-type connection must be sized to accommodate the larger stations power demand and connection to generator set. Site visits are strongly encouraged. Please contact the Water and Sewer Superintendent at kabraham@ayer.ma.us or 978-772-8240 for an appointment.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.