Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

November 19, 2024

July 2, 2025

60 Airport Dr

Renovation

No Information to Display

$2,175,000.00

Public - City

img_map_placeholder

60 Airport Dr, Rockford, IL

18

8

2

3

Subscribe to View Full Documents

The project work consists of the following major items and approximate quantities: The Base Bid scope of work shall include removal and replacement of one (1) Passenger Boarding Bridge, installation of one (1) new Ground Power Unit, Installation of one (1) new Preconditioned Air Unit, installation of one (1) new Baggage Slide, and associated electrical upgrades. The Additive Alternate 1 scope of work shall include the removal, salvage, and replacement of one (1) Passenger Boarding Bridge, installation of one (1) new Ground Power Unit, Installation of one (1) new Preconditioned Air Unit, installation of one (1) new Baggage Slide, and associated electrical upgrades The Disadvantaged Business Enterprise (DBE) goal for the project has been established at 2.5%. A bid bond, cashiers check, or a certified check made payable to the order of the Chicago Rockford International Airport in the amount of ten percent (10%) of the total bid must be deposited by each bidder with his bid as guarantee that in case the contract is awarded to him, he will within fifteen (15) days thereafter, upon receipt of written notice of award, execute such contract and furnish a satisfactory performance bond. Upon failure to do so, he shall forfeit the deposit as liquidated damages and acceptance of the bid will be contingent upon the fulfillment of this requirement by the bidder. The checks or bid bonds of all, except the three (3) lowest responsible bidders, will be returned within ten (10) days after the bids are opened and read. The successful bidder, as determined by the Owner, will be required to agree that no less than the prevailing rate of wages will be paid to all workmen, laborers, and mechanics performing their work under this contract. All proposals must be made on forms furnished within this set of Contract Documents. The successful bidder will be required to furnish performance bond satisfactory to the owner in the amount of the contract. The owner reserves the right to waive or not to waive any irregularities in the bids and to reject any or all bids and to determine which is the lowest and best bid or combination of bids for the improvements.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects