Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 26, 2024
December 1, 2024
October 17, 2025
5150 Western Ave
Renovation
No Information to Display
$500,000.00
Public - State/Provincial
5150 Western Ave, Morganton, NC
A. The Work of Project is defined by the Contract Documents and consists of the following 1. NC Department of Adult Corrections is replacing the 350-ton chiller at Foothills Correctional Institution. The project includes new controls for the chiller plant, pumps, piping modifications. B. Type of Contract: 1. Project will be constructed under a single prime contract. Paint and/or identify the following: 1. Chilled and Condenser water piping. 2. All mechanical equipment including valves 3. All electrical equipment, including panels. 4. Control panel and visible control components. The Testing and Balancing Agency (TAB) shall be selected and hired by the Contractor and shall be certified by the Associated Air Balance Council (AABC) or National Environmental Balancing Bureau (NEBB). The Agency shall show proof of having successfully completed at least five projects of equal size and scope within the previous three years, and shall have on its staff a fulltime Professional Engineer registered in the State of North Carolina. Immediately after the award of a contract, the contractor shall perform a Design Review of the mechanical plans and specifications. He shall identify any omissions or discrepancies that will preclude the proper balancing of the systems and report same to the Owner in a formal report Test and balance New Chiller chilled and condenser water systems as shown and specified on the schedules and Contract Documents and make submittals as described in this Section. Furnish and install insulation for the following: 1. Exposed mechanical equipment not pre-insulated by manufacturer that contains chilled water. 2. Chilled water piping. 3. Repair any existing insulation damaged during construction and/or removed for tie-in to new piping Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation, or a bid bond in an amount equal to not less than five percent (5%) of the proposal, said deposit to be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten (10) days after the award or to give satisfactory surety as required by law (G.S. 143-129). The successful bidder, upon award of contract, shall furnish a performance bond in an amount equal to 100 percent of the contract price The successful bidder, upon award of contract, shall furnish a payment bond in an amount equal to 100 percent of the contract price No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days. The owner reserves the right to reject any or all bids and to waive informalities.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Morganton, NC
Bid Date: Sep 17 2024
Morganton, NC
Bid Date: Sep 18 2024
Morganton, NC
Bid Date: Sep 18 2024
Morganton, NC
Bid Date: Oct 16 2024
Morganton, NC
Bid Date: Sep 24 2024
Morganton, NC
Bid Date: Sep 24 2024
Morganton, NC
Bid Date: Sep 24 2024
Morganton, NC
Bid Date: Jan 10 2024
Morganton, NC
Bid Date: Feb 06 2024
Morganton, NC
Bid Date: Jan 08 2024
Morganton, NC
Bid Date: Nov 02 2023
Morganton, NC
--
Morganton, NC
Bid Date: Nov 01 2018
Morganton, NC
Bid Date: Dec 01 2022
Morganton, NC
Bid Date: Sep 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
