Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

May 1, 2025

1305 East St

Renovation

No Information to Display

$300,000.00

Public - State/Provincial

img_map_placeholder

1305 East St, Sidney, IA

7

4

2

Subscribe to View Full Documents

Question Deadline 09/15/2024 at 10:00 PM CT Question Cuttoff Date & Time. Please post questions to site or via e-mail to julie.brown@iowadot.us before the question cutoff deadline. Questions or requests for site visit received after this date and time will not be accepted. Pre-bid substitution form is due on or before: September 15, 2024, at 10 PM CST. Overview: The Iowa Department of Transportation is seeking bids for a qualified contractor to; Furnish & install windows and casings at the Sidney Maintenance Garage located at 1305 1/2 E Filmore Sidney, IA 51652. Specifications for materials and site photos can be found on the Attachment tab. Scope: Remove and replace two (2) office windows and Remove and replace two (2) breakroom windows and casing. Contractor to confirm measurements. Award: It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: Meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. Other factors may also include a comprehensive review of bidders as work performance and work capacity. Estimated project start date- Upon issuance of award (The date shall be coordinated with the IDOT Project Manager. (This is the estimated start date after all required documents are received (i.e., Insurance, performance bond and vendor signed contract). Estimated project end date- 05/01/2025 (This includes resolution to all punch list items, inspections and DOT acceptance typically used in construction bids) Note: Contractors to propose a suggested revised completion date taking into consideration weather conditions or other factors. This is a required Attribute. See Attribute #10. Davis Bacon wages to do not apply. Sales tax exempt. IADOT - Sidney Maintenance Garage - Windows & Casings

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects