Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

November 11, 2024

December 15, 2025

Multiple Locations

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Fremont, IN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Bids Shall Be Submitted in an Enclosed Opaque Sealed Envelope, Marked Town of Fremont 2024 Wastewater Dewatering Improvements . The Project is Locally Funded, and Bids Will Be Evaluated and May Be Held Up to Sixty (60) Days. It is the Intent That an Award, Contracts and Notice to Proceed Will Be Executed and Issued by October 2024. In General, the Project Includes the Installation of a Sludge Dewatering Unit (All Required Work, Materials, Equipment, Labor, Etc.) at the Existing Wastewater Treatment Plant. Each Bid Shall Be Accompanied by a Certified Check or Acceptable Bidder's Bond Made Payable to the Owner, in a Sum of Not Less Than Five Percent (5%) of the Total Amount of the Highest Aggregate Proposal, Which Check, or Bond Will Be Held by the Owner as Evidence That the Bidder Will, if Awarded a Contract or Contracts, Enter Into the Same With the Owner Upon Notification From the Owner to Do So Within Fourteen (14) Days of Said Notification. Approved Performance and Payment Bonds Guaranteeing Faithful and Proper Performance of the Work and Materials, to Be Executed by an Acceptable Surety Company, Will Be Required of Each Contractor at the Time of Contract Execution. The Bond Will Be in the Amount of One Hundred Percent (100%) of the Contract Price and Must Be in Full Force and Effect for a Period of Twelve (12) Months From the Date of Written Acceptance of and Final Payment of the Work. Failure to Execute a Contract and to Furnish a Performance and Payment Bond as Hereinafter Set Out Will Be Cause for Forfeiture to the Owner of the Amount of Money Represented by the Certified Check or Bidder's Bond, as and for Liquidated Damages. No Bids Shall Be Withdrawn After the Opening of Bids Without the Consent of the Owner for a Period of Sixty (60) Days After the Scheduled Time of Receiving Same. The Owner Reserves the Right to Reject Any Bid, or All Bids, or to Accept Any Bid or Bids, or to Make Combination of Bids as May Seem Desirable, and to Waive Any and All Informalities in the Bidding. The Work will be substantially completed by November 15, 2025, and final completion by December 15, 2025.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.