Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2024

November 4, 2024

January 6, 2025

N Foster Rd

Site Work

No Information to Display

$500,000.00

Public - County

img_map_placeholder

N Foster Rd, San Antonio, TX

58

12

5

Subscribe to View Full Documents

4. Bidders should use unit pricing. Bid, payment, and performance bonds are required. For additional information, contact David R. Wegmann, P.E., Bexar County Public Works, Assistant County Engineer, at (210) 335-6700. Please submit all bid questions for the N. Foster Road at Wildflower Way Traffic Signal project by Wednesday, September 18, 2024 at 4:00 Scope of Project: Construction of a new traffic signal, associated pedestrian amenities, and necessary sidewalk improvements at the intersection of Foster Rd. and Wildflower Way. The Foster Road at Overlook Parkway Traffic Signal Project is located on the east side of San Antonio. The project includes the construction of a traffic signal at the intersection, replacement of sidewalk and curb ramps, and pavement markings and signing. Scope of Work: Limits: Within 600 feet of the intersection on each approach Traffic signal construction at the intersection ADA curb ramps on two corners of the intersection Pavement Markings on all approaches Replace, relocate or remove signs on each approach Underground utilities shall be located and verified prior to beginning any construction work Any request for modifications must be submitted in writing and approved by the Design Consultant & Bexar County Public Works All work will be located within the existing Right-of-Way Duration for Completion - Within 45 Working Days Liquidated Damages - $700/Working Day Schedule for Completion - One construction phase for the all traffic signal, ADA Ramps, Signing and Pavement Markings Any request for modifications must be submitted in writing and approved by the Design Consultant & Bexar County Public Works Traffic Control - Use Standard TxDOT Standard Traffic Signal Work Barricades and Signs Standards for TCP (WZ (BTS-1-2) -13

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects