Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

November 18, 2024

June 16, 2025

Multiple Locations

Site Work

No Information to Display

$1,141,694.00

Public - City

img_map_placeholder

Multiple Locations, Bakersfield, CA

8

6

3

6

Subscribe to View Full Documents

The work to be performed consists, in general, installation of new communication equipment and software along the street corridor segments of (1) California Avenue between Mohawk Street and Oak Street, (2) Stockdale Highway between Coffee Road and H Street, and (3) Brundage Lane between Oak Street and Hughes Lane (Interconnect). This communication system over existing fiber communication network will enable transportation professional to proactively manage traffic flow and promote mobility through real-time traffic data collection and management tools. New software and signal controller units will allow for optimal signal timing across arterial network by adjusting cycle lengths, phase splits, and offsets based on prevailing traffic. California Avenue between Mohawk Street and Oak Street Stockdale Highway between Coffee Road and H Street Brundage Lane between Oak Street and Hughes Lane The DBE Contract goal for this project is 7% percent. All questions regarding this project must be directed to Joe Catalan, Public Works Department, at jcatalan@bakersfieldcity.us. Bid Bond 10.00% Payment Bond100.00% Performance Bond 100.00% Liquidated Damages $1,000.00 per day Estimated Bid Value $1,163,832.00 Project Duration 150 working days The City of Bakersfield reserves the right to reject any or all bids. Bids are required on the entire work described herein. Substitution of securities for moneys retained to ensure performance shall be permitted pursuant to the provisions and requirements of Public Contracts Code 22300. Eligible securities include interest bearing demand deposit accounts, standby letters of credit, or any other security agreed to by the Contractor and the City of Bakersfield. The request for substitution of securities to be deposited shall be submitted on the form entitled "Escrow Agreement for Security Deposits in Lieu of Retention," a copy of which is included in Part E of this document. The Contractor must possess a valid Class A or a Class C-10 Contractor's License at the time this contract is awarded.

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects