Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

December 2, 2024

January 1, 2026

Multiple Locations

Site Work

No Information to Display

$4,938,360.00

Public - City

img_map_placeholder

Multiple Locations, Venice, FL

35

13

152

6

Subscribe to View Full Documents

The purpose of this Project is to install a new redundant force main, replace the tapping sleeve connection on the existing force main, construct a new gravity sewer system, and as an additive alternate, install an in-line/open channel grinder. Bid Bond 5% Bid Bond Required Project Estimated Budget $4,938,360.00 The City reserves the right to reject any or all bids/proposals in whole or in part, with or without cause, to waive any requirements, irregularities or technical defects therein, when it is deemed to be in the interest of the City. QA date 09/24/2024 1 PM

50 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.