Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

No Information to Display

3401 Martin Luther King Jr Blvd

Outdoor Lighting, Paving, Site Work

No Information to Display

$3,381,500.00

Public - State/Provincial

img_map_placeholder

3401 Martin Luther King Jr Blvd, Tuscaloosa, AL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Exterior Sitework and Campus Improvements at the C.a. Fredd Campus Shelton State Community College Tuscaloosa, Alabama and Thereafter Delivered to the Owner for Consideration of Approval to Bid This Project. The Work on This Project Includes but is Not Limited to the Following: Renovations of Pedestrian and Vehicular Ways, Signage, Power Upgrades, Lighting, Landscaping, and Exterior Campus Improvements.; as Specified and as Indicated on the Drawings; Coordination and Supervision of the Entire Project; and All Related Work, as Indicated in The Bid and Contract Documents. *Interested bidders/subcontractors are to contact Robins & Morton Group to be added to the bid list. A Cashier's Check or Bid Bond Payable to Shelton State Community College in an Amount Not Less Than Five (5) Percent of the Amount of the Bid, but in No Event More Than $10,000, Must Accompany the Bidder's Proposal. Performance and Statutory Labor and Material Payment Bonds, Insurance in Compliance with Requirements, and Verification of E-Verify Enrollment (Also with Proposals), Will Be Required at the Signing of the Contract. All Bidders Bidding in Amounts Exceeding That Established by the State Licensing Board for General Contractors Must Be Licensed Under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as Amended, and Must Show Such Evidence of License Before Bidding or Bid Will Not Be Received or Considered by Architect or Owner; the Bidder Shall Show Such Evidence by Clearly Displaying Their Current License Number on the Outside of the Sealed Envelope in Which the Proposal is Delivered; Bidder Must Also Include Their Current License Number on the Proposal Form. No Bid May Be Withdrawn After the Scheduled Closing Time for Receipt of Bids for a Period of Sixty (60) Days. This Project is Being Bid Excluding Taxes and Requires the Contractor to Comply with the Requirements of Act 2013-205, Which Was Signed into Law on May 9, 2013. The Contractor and the Owner Will Be Required to Apply for Certificates of Exemption with the Alabama Department of Revenue Which Will Handle Administration of the Certificates. The Contractor Shall Account for the Tax Savings on the Proposal Form. Additional Qualifications and Requirements for General Contractor Bidders and Separate Subcontractors and Manufacturers Are Indicated in the Bid and Contract Documents. Pre-bid Conference Will Be Held at 9500 Old Greensboro Rd, Tuscaloosa, Al 35405 to Review the Project and Answer Bidder's Questions. Attendance at the Pre-bid Conference is Not Required but Highly Recommended for All Prime Contractor Bidders (and Any Subcontractors) Intending to Submit a Proposal.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.