Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 18, 2024

October 18, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$162,156.00

Public - County

img_map_placeholder

Multiple Locations, Omaha, NE

11

5

4

Subscribe to View Full Documents

The work consists essentially of the following estimated quantities: approximate quantities bid hem 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Description concrete pavement repair, large area concrete pavement repair, small area full depth saw cut existing pavement adjust gas valve to grade adjust water valve to grade adjust manhole to grade remove and replace 6" pcc multi-use trail remove and replace pcc sidewalk remove and replace pcc curb ramp remove multi-use trail remove pcc sidewalk remove pcc curb ramp construct 6" pcc multi-use trail construct pcc sidewalk construct pcc curb ramp construct detectable warning panel (16 locations) remove and replace faulty subgrade adjust sprinkler (as needed) quantity 424 1,177 2,669 2 3 4 88 74 49 12 1,122 808 135 1,546 425 136 25 14 unit sy sy lf ea ea ea sf sf sf sy sf sf sf sf sf sf tn EA. The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, easement acquisition, and miscellaneous costs) is $189,200.00. All proposals must be submitted on bid forms furnished by E & A Consulting Group, Inc., and must be accompanied by a bid bond or a certified check In the amount not less than $9,500.00 made payable to the Treasurer of Sanitary and Improvement District 456 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of THIRTY (30) days after date set for opening of bids. The bid security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked "BID SECURITY" with the project identified thereon. Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. The work herein provided shall be done under written contract with the responsible bidder submitting the lowest acceptable bid in accordance with the requirements. Sanitary and Improvement District 456 of Douglas County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.