Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

November 18, 2024

July 9, 2026

San Gabriel Pkwy

Paving, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

San Gabriel Pkwy, Leander, TX

217

12

8

7

Subscribe to View Full Documents

To provide construction services for the delivery of the of San Gabriel Parkway Phase 2. The Work consists of extending San Gabriel Parkway by approximately 2,200 feet eastward, from the existing section in Palmera Bluff to Ronald W. Reagan Boulevard. The four-lane, divided roadway will require tree removal, grading, paving, and the installation of a stormwater drainage system. Only the south two lanes will be constructed at this phase. Question Deadline 10/01/2024 at 5:00 PM CT

79 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.