Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 28, 2024

December 12, 2024

To Be Determined

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

To Be Determined, Marietta, MS

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe to View Full Documents

The Contractor will repair and repaint a 200,000 Gallon Elevated Storage Tank. Questions regarding website registration, online orders or electronic bidding requirements, please contact Plan House Printing in Tupelo, MS at (662) 407-0193 or email tupelo@planhouseprinting.com. The Contract Documents, including Drawings and Specifications, may be examined at the office of: 1) Houston Palestine Water Association, and 2) Engineering Solutions, Inc. The BID SCHEDULE may be examined at the following locations: A. Mississippi Procurement Technical Assistance Program (MPTAP) Mississippi Development Authority, Minority & Small Business Development Woolfolk Building, 501 North West Street, Suite B 01 Jackson, MS 39201 B. Plan House Printing 605 W. Main Street Tupelo, MS 38804 (662) 407-0193 A satisfactory Bid Bond executed by the Bidder or an accepted Surety, a certified check, or bank draft payable to the HOUSTON PALESTINE WATER ASSOCIATION, on negotiable U.S. Government Bonds (at par value), shall be submitted with each bid in an amount equal to five percent (5%) of the total bid. Minority and women's business enterprises are solicited to bid on this contract as prime contractors, and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material, and/or supply needs. Mobilization shall consist ofmoving all labor, equipment, supplies, and incidentals to the project site and removing same after other work under the contract has been completed. It shall also include all mobilization pre-construction costs which are necessary direct costs to the project and are of a general nature rather than directly attributable to other pay items.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.