Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 20, 2024
November 15, 2024
February 1, 2025
To Be Determined
Site Work
No Information to Display
$200,000.00
Public - County
To Be Determined, Brooks, GA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Brooks Baseball Fields #1 and #3 Fencing - Install backstop 20'tall with a 5-foot overhang running from dugoutto dugout with an extra retaining bar 12 inches from bottom rail. there will be the normal middle rail installed also. overhang welding of post shall be allowed. contractor will be responsible for measuring the field for exact distances. FABRIC: All fabric 20' tall and the 5' overhang shall be 9-gauge core extruded bonded. (2" mesh) black, installed knuckles up. Fabric shall be stretched taut using a stretching bar. TOP RAIL: 1 5/8-inch O.D. Black Master Color 'LCX' LG-40 pipe. 21 ' lengths, joined with 1 5/8-inch sleeve where applicable. MIDDLE RAIL: Shall be attached to the entire length of the back stop. An extra middle rail retaining bar shall be placed 24" from the bottom rail on the back section directly behind the catcher. BOTTOM RAIL: Shall be attached to the entire length of the back stop. An extra bottom rail retaining bar shall be place 12" from the bottom rail. LINE POST: Set 10' on center maximum spacing if applicable and line posts shall be 2 1\2" O.D. Black Master Color LCX LG-40 pipe. ALTERNATE BID: Paint backstop vertical terminal post on field #1 instead of replacing the post. Metal Roof: 26 gage Multi Rib Metal Roof (Black Color) o Metal Roof to Overhang 2" all sides o All dugout roof rails shall be spaced 36' apart. Roof rails shall be black to match backstop. o Black Fence Fabric on side and back. Open dugout entrances shall remain where they are currently located on field #1. Open dugout entrances shall be located on outfield side of dugout on field #3. o All vertical supports 2 7/8" in black to match backstop. o All rails 1 5/8" in black to match backstop. o 1 1/2" rigid pipe clamps in black to match backstop. o All end rail cups, brace bands, end rail clamps and hardware shall be black to match backstop. o Contractor shall coordinate with Fayette County on needed concrete work on backside of 1st base dugout. o See Attachment A for an example of a dugout drawing. Dugout heights and lengths shall remain as they are currently. Questions concerning this invitation to bid should be addressed to Michelle Sampson in writing via email to msampson@fayettecountyga.gov or fax to (770) 719-5544. Questions will be accepted until 2:00 (pm), Friday, September 13, 2024. ALL WORK MUST BE COMPLETED BETWEEN NOVEMBER 15, 2024, AND FEBRUARY 1,2025.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Lagrange, GA
Bid Date: Oct 01 2024
Lawrenceville, GA
Bid Date: Oct 01 2024
Atlanta, GA
Bid Date: Sep 20 2024
Woodstock, GA
Bid Date: Sep 04 2024
Atlanta, GA
Bid Date: Sep 27 2024
Braselton, GA
Bid Date: Oct 18 2024
Savannah, GA
Bid Date: Aug 07 2024
Reidsville, GA
--
Roswell, GA
Bid Date: Oct 10 2024
Macon, GA
Bid Date: Aug 27 2024
Brunswick, GA
Bid Date: Sep 20 2024
Hinesville, GA
Bid Date: Sep 17 2024
Decatur, GA
Bid Date: Sep 27 2024
McDonough, GA
Bid Date: Sep 20 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
