Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 9, 2024

December 2, 2024

December 2, 2025

Mare Island Causeway

Renovation

No Information to Display

$9,953,000.00

Public - City

img_map_placeholder

Mare Island Causeway, Vallejo, CA

53

7

5

Subscribe to View Full Documents

The work to be done, in general terms, consists of: In accordance with the Plans and Specifications, the work includes furnishing all labor, materials, tax, equipment, incidentals and services for the construction and completion of the MARE ISLAND CAUSEWAY BRIDGE (23C-0248) PREVENTATIVE MAINTENANCE AND REPAIR ACTIVITIES PROJECT PW9762, FEDERAL AID PROJECT NO. BPMP-5030(060). o Spot repair and overcoat lift span and towers. o Repairing cracked, spalled and delaminated concrete in the substructure and superstructure. o Repair cracks and apply a polyester overlay on the bridge deck. o Replace deck joint seals. o Replace missing bolts in stringers and bearings. o Replace damaged sidewalk panels. o Repair or replace deteriorating piles. o Replace anodes. o Repair or replace metal railing posts. o Clean, repair, and paint metal railing. o Repair existing timber fenders. o Repair and replace existing lighting. o Apply traffic striping to bridge deck and roadway. The bidder shall include in his bid and provide all labor, tools and materials for a complete and working project in conformance with the intent shown on the plans and specified herein. Location: Mare Island Causeway Bridge (23C-0248) Anticipated Schedule: start of construction Dec 2024 Number of working days: 365

54 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.