Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2024

October 14, 2024

November 29, 2024

OR-224 & SE Monroe St

Site Work

No Information to Display

$167,895.00

Public - City

img_map_placeholder

OR-224 & SE Monroe St, Milwaukie, OR

8

5

3

Subscribe to View Full Documents

The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in specifications including but not limited to: . Install approximately 220 lineal feet of ductile iron potable water pipe, 12-inch diameter . Install fittings and couplings with restrained joints . Abandon approximately 200 lineal feet of existing water pipe . Install approximately 90 tons of asphalt concrete pavement (ACP) . Replace approximately 4 traffic signal loop detectors . Rehabilitate street markings and signs . Perform additional and Incidental Work as required by the specifications and construction plans . Hour of work shall be between 9 p.m. and 5 a.m. . All work must be completed by November 29, 2024 Question Deadline 09/05/2024 at 2:00 PM PT All questions and clarifications for this ITB must be addressed through the Citys Procurement Portal by clicking on Messages and then the Public Q&A tab within the desired solicitation. City's engineer estimate for this project ranges from $140,000 to $165,000. This project is a public works project subject to the State of Oregon prevailing wage rates under ORS 279C.800 to 279C.870. No bid will be considered unless the bid contains a statement by the bidder that the provisions required by ORS 279C.838 or ORS 279C.840, as applicable, pertaining to prevailing wages, shall be included as part of the awarded contract. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279A.120. All bids must be submitted in the prescribed form and said manner outlined in the solicitation. Bids shall be accompanied by a certified check, cashier's check, or bid bond made payable to the City of Milwaukie in an amount equal to ten percent (10%) of the total bid amount. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.