Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

October 25, 2024

July 17, 2026

Winslow Ave

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Winslow Ave, Medford, MA

94

23

2

5

Subscribe to View Full Documents

Reference Number : 0000361506 Carr Park Phase 2 Renovations in Medford, Mass. 02155 Question Deadline 09/27/2024 at 4:30 PM ET Questions are submitted online : Yes . Each Bid shall be submitted in accordance with the Instruction to Bidders and shall be accompanied by a Bid Security in form of a bid bond, or certified check, and/or a treasurers or cashier's check issued by a responsible bank or trust company in the amount of five (5) percent of the bid Location and Work to be Done The Work consists of removal of existing playground, paved courts, fencing, and sports lights within limit of work; new covered basketball court structure with roof-mounted solar panels and ground improvements to support foundations; drainage and electrical improvements; sport courts; dog park; fitness area; skate park; accessible playground; splash pad with ground sprays; athletic and pedestrian-scale lighting; modifications to and expansion of existing irrigation system; site furnishings; tree plantings and lawns; and add alternates consisting of: climbing boulders with cable net connector (Add Alt. #1) and climbing boulder for ages 2-5 (Add Alt. #2) and all work incidental thereto, in accordance with the Specifications and conceptual plans attached hereto. Additional drawings showing details in accordance with which the Work is to be done may be furnished by addendum from time to time during the bidding period by the Owner or its Architect/Engineer and shall then become a part of the Contract Documents. The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified. Participation Requirements - Airport Concessionaires Disadvantaged Business Enterprise (ACDBE) - Business Concern - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Native American Participation - Small Business Participation - Service-Disabled Veteran Owned - Women-Owned Business Participation General Requirements - Bid Deposit Required - Certified Payroll - Federally Funded - Insurance Required - Prevailing Wage Required - Training Required Minimum Wage Rates as determined by the Commissioner of the Department of Labor and Workforce Development under the provision of Massachusetts General Law (M.G.L.) c. 149, 26 to 27D, as amended, apply to this project. It is the responsibility of the Bidder, before bid opening, to request, if necessary, any additional information on Minimum Wage Rates for those tradespeople who may be employed for the proposed work under this Contract. The bidding and Award of this Contract will be under the provisions of M.G.L. c. 30, 39M. The City of Medford reserves the right to accept any bid, in whole or in part, to reject any/or all bids and to waive minor irregularities and/or informalities as it deems to be in the best interest of the City.

54 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects