Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 24, 2024

June 21, 2025

119 Maximillion Dr

Site Work

No Information to Display

$800,000.00

Public - City

img_map_placeholder

119 Maximillion Dr, Madison, AL

16

15

6

5

Subscribe to View Full Documents

Construction of Griffin Water Storage Tank Site Development and Water Transmission Main Krebs Project A summary of the work items is included below: The project generally consists of site preparatory work for a new 5.0 MG water storage tank and will include the following items: clearing and grubbing, site excavation (rock), tank site fine grading, access road construction, water transmission main construction, electrical service construction, and drainage improvements. The work of constructing the project will be let under one Contract if an award should be made; and the Owner reserves the right to select the Bid considered by the Owner to be in the best interest of the Owner. A cashier's check or bid bond payable to Madison Utilities Board in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. Bids must be submitted on proposal forms furnished by the Engineer. All bidders bidding in amounts exceeding that established by the state licensing board for general contractors must be licensed under the appropriate/applicable provisions of state law, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interest of the Owner will thereby be promoted. Pre-Qualification: Yes

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects