Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 23, 2024

September 30, 2024

May 30, 2025

3495 Via Altamira

Renovation

No Information to Display

$1,400,000.00

Public - City

img_map_placeholder

3495 Via Altamira, Henderson, NV

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

The City of Henderson, Nevada, is soliciting responses from qualified construction managers/general contractors (Proposer) for the performance of Construction Manager at Risk (CMAR) services for the addition of one (1) new Parks & Recreation Maintenance Building to be located at Montagna Park in Via Inspirada (Project). The building will house one (1) new equipment maintenance bay, one (1) workroom w/ small kitchen, two (2) offices, one (1) gender-neutral restroom, one (1) exterior mechanical enclosure, and one (1) new MDF closet. The size of the building is approximately 1,460 SF and should be constructed out of load bearing CMU blocks (exterior) and metal stud framing for all other walls (Interior). CMAR will also be responsible for grading approximately 1.5 acres. The Construction identified shall improve inefficiencies and incorporate future staff needs and growth projections. Question Cuttoff Date & Time 9/12/2024 12:00:00 PM (PT) 10/16/2024 12:00:00 AM (PT) Step 2 - Presentations/Interviews With Shortlisted Firms liquidated damages in the amount of Five Hundred Dollars ($500) per business day Pre-construction services are anticipated to begin in the fourth quarter of 2024 with the construction document phase. The City will work with the selected CMAR to determine the best overall project schedule in order to be complete by summer 2025 (actual completion date to be determined based on project needs)

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.