Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 10, 2024

October 23, 2025

60 Community Dr

Paving, Renovation, Site Work

No Information to Display

$3,750,000.00

Public - County

img_map_placeholder

60 Community Dr, Sanford, ME

81

31

58

4

Subscribe to View Full Documents

Question Deadline 09/16/2024 at 5:00 PM ET Questions and comments regarding the project design specifications or drawings shall be directed in writing to the CHA Architecture Shane Dunn sdunn@chasolutions.com Questions and comments on the bid opening process shall be addressed to: Deane Rykerson, Division of Planning, Design & Construction, Bureau of General Services, 77 State House Station, Augusta, Maine 04333-0077, Deane.Rykerson@maine.gov The Work involves the construction of the expansion for the York County Community College Center of Excellence for Manufacturing and Trades at the location indicated on Drawings. Work includes but is not limited to, selective demolition, earthwork, site utilities and site improvements, paving and landscaping. Work also includes concrete foundations and slab-on-grade, steel structure, steel joists and decking, load-bearing CMU, non load-bearing CMU, roof membrane over roof insulation, metal stud partitions, insulated metal panels, gypsum board walls and ceilings, acoustical ceilings, resilient flooring, carpeting, custom cabinets and fixtures, carpentry, glass storefront system, metal doors, metal frames, door hardware, painting, toilet accessories, signage, folding panel partitions, electrical, and heating, ventilating, and air conditioning complete and ready for use. The cost of the Work (prime Contractor contract) is approximately $3,750,000.00. The contract shall designate the Substantial Completion Date on or before 9 October 2025, and the Contract Final Completion Date on or before 23 October 2025.

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.