Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 28, 2024

October 28, 2026

To Be Determined

Site Work

No Information to Display

$913,117.00

Public - Federal

img_map_placeholder

To Be Determined, Johnson, MS

1

31

16

2

Subscribe to View Full Documents

FOR: 10MW Generation Plant and Feeder Microgrid, CSJFTC, Camp Shelby, MS. The Adjutant General reserves the right to reject any and/or all bids and to waive informalities. The construction contemplated in the following specifications and the attached or accompanying documents including plans prepared as essential parts hereof include furnishing all plant, labor, tools equipment, materials, fixtures, accessories and other things necessary for construction of project as specified herein and as shown on the drawings. The State of Mississippi, represented by the Adjutant General of said State, shall be hereinafter referred to as the Director, State Purchasing and Contracting and/or Contracting Officer. Wherever the term "Owner" is used, it shall refer to the State of Mississippi. 1. Construct generation plant and microgrid controller. 2. Construct switchgear building to house electrical components in support of the generation plant. 3. Install gas service line from generation plant to existing gas service on camp Shelby. Contractor shall provide all material, labor, services, and equipment necessary for the completion of the work as indicated on the plans and specifications and other contract documents. It shall be incumbent upon all bidders to understand the provisions of the specifications and to obtain clarification prior to the time and date set for the bid opening. Such clarification will only be in form of a response to a written request and received not less than six (6) working days prior to the bid opening. No clarification will be offered as a response to a telephone request.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects