Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

No Information to Display

2700 Strong Heart Way Rd

Renovation

No Information to Display

$60,000.00

Public - Federal

img_map_placeholder

2700 Strong Heart Way Rd, Suttons Bay, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Reference Number 0000346734 The Grand Traverse Band of Ottawa and Chippewa Indians (Grand Traverse Band or GTB) is requesting Proposals from qualified contractors interested in contracting with the GTB to provide HVAC Services to replace boilers on the HVAC system at the Grand Traverse Bands Strongheart Civic Center. The new system must be energy-efficient, comply with all relevant regulations and codes, and ensure optimal climate control throughout the facility. The Site is Located at: The Grand Traverse Band of Ottawa and Chippewa Indians Strongheart Civic Center Located at: 2700 Strongheart Way Peshawbestown, Michigan 49682 Question Deadline 09/13/2024 at 5:00 PM ET Questions are submitted online No, Any questions regarding this RFP should be sent to: Ron Anderson, GTB Facilities Manager. ron.anderson@gtb-nsn.gov o Interested contractors should have a proven track record in HVAC system installation and replacement. o Contractors must be licensed, insured, and compliant with all relevant local and state regulations. o The contractor will be responsible for providing all equipment and supplies used to complete the requested work. o Special Requirements - Contractor shall use caution to: o Exercise care to prevent damage to adjacent structures, sidewalks, walkways, and streets. o Ensure that existing buildings in the area can operate normally without significant disruption during working activities. o Ensure the facility will be secured after hours. o All timesheets for prevailing wages must be kept in accordance with the federal Davis Bacon Act. o Contractors are to report on any subcontractors used in the performance of the project Buyer Preferences, Guidelines & Requirements General Requirements - Certified Payroll - Insurance Required - Prevailing Wage Required All projects over $250,000.00 will need to acquire performance and payment bonds. Bonding will be in the amount of 100% of the contract cost. No proposal may be withdrawn for a period of ninety (90) days after the proposal submission date. The Grand Traverse band of Ottawa and Chippewa Indians also reserves the right to reject any and all proposals.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects