Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 18, 2024

September 23, 2024

May 30, 2025

1319 N 12th St

Renovation

No Information to Display

$820,069.00

Public - State/Provincial

img_map_placeholder

1319 N 12th St, Grand Junction, CO

15

3

4

5

Subscribe to View Full Documents

Date Email Questions Due 09/06/2024 11 am MST Colorado Mesa University (CMU) is seeking bids from qualified contractors to remove existing HVAC system and replace with a new heat pump system in the fourth-floor mechanical room of Lowell Heiny Hall (LHH) connected to campus geothermal loop. To Connect and route the geothermal heat exchange loop piping from outside of LHH to the fourth-floor mechanical room. The existing chiller, located on the roof all related piping and accessories shall be removed, disposed of and replaced with new water sourced heat pumps. The system will be connected to the geothermal heat exchange loop that was expanded in summer 2024 and terminated next to the building on the west side of LHH. The contractor chosen to perform the work will have access to the building beginning on: September 16, 2024, and must complete the work on or before May 30, 2025. Reference Number 0000361462 Job Location: Lowell Heiny Hall, 1319 N 12th St. Grand Junction,, CO 81501 Estimated Construction Cost: $820,069 Anticipated General Contractor Start 09/23/2024 Anticipated Construction Start/Finish 05/30/2025 Colorado Mesa University (CMU) is seeking bids from qualified contractors to remove existing HVAC system and replace with a new heat pump system in the fourth-floor mechanical room of Lowell Heiny Hall (LHH) connected to campus geothermal loop. To Connect and route the geothermal heat exchange loop piping from outside of LHH to the fourth-floor mechanical room. The existing chiller, located on the roof all related piping and accessories shall be removed, disposed of and replaced with new water sourced heat pumps. The system will be connected to the geothermal heat exchange loop that was expanded in summer 2024 and terminated next to the building on the west side of LHH. The contractor chosen to perform the work will have access to the building beginning on: September 16, 2024, and must complete the work on or before May 30, 2025. Question Deadline 09/06/2024 at 11:00 AM MT Questions are submitted online Yes, Point of Contact/Clarification Name: Tracey Cornwell Agency: Colorado Mesa University Phone: 970-248-1433 Email: tcornwell@coloradomesa@edu Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Certification/Training - Contractors License Required - FOB Destination - Installation Required - Insurance Required - License Required - Local Service Required - Material Safety Data Sheets Required - Onsite Maintenance Required - Prevailing Wage Required - Safety Standards Plan - Spill Containment Plan - Training Required - Warranty Information Required Bonding Requirements - Bid Bond 5 %

31 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects