Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 10, 2024

October 10, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$1,345,381.00

Public - City

img_map_placeholder

Multiple Locations, Brentwood, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe to View Full Documents

As of September 18. 2024, this project has not yet been awarded. A timeline for award has not yet been established. Contract A - Manhole to Manhole Lining Contract This project involves combination sewer CIPP rehabilitation work including, but not limited to, full length CIPP lining; pre and post NAASCO CCTV inspection; internal reinstatement of active service laterals; internal removal of protruding service laterals; site access development and restoration; resident, business and municipal notifications; bypass pumping; traffic control; site restoration and all appurtenances required by the Contract Documents, complete in place. Contract B - Excavation Repairs Contract This project involves sanitary and storm sewer open cut rehabilitation work including, but not limited to: open cut point repairs; removal and replacement of wye and lateral pipe; installation of manholes; location and adjustment of buried sewer manholes; manhole invert replacement; CCTV verification of repair locations; post-repair NASSCO certified CCTV; site access development and restoration; resident, business and municipal notifications; bypass pumping; traffic control; site restoration and all appurtenances required by the Contract Documents, complete in place. The Borough intends to award a contract that permits the Borough, at its sole discretion, to retain the services of the selected vendor for a term of up to three years. In addition to providing unit costs for work performed in FY 2024-2025, bidders shall separately indicate costs for two separate one-year renewal periods (FY 2026 & 2027). Such renewal prices shall be in the form of flat percentage mark-ups on the FY 2024-2025 unit costs. Bidder is responsible for restoration of all disturbed areas and for any needed traffic control and resident notification letters. Bidder shall be required to maintain performance bond, labor & materials payments bond, public liability insurance, property damage insurance, and worker's compensation insurance in the amount specified in the proposal documents, and certificates associated with the same shall be filed with the Borough at the time that an agreement is executed with the selected bidder. All proposals shall additionally comply with Pennsylvania prevailing wage regulations. In order to receive consideration, bidders must accompany with the proposal either a formal Bid Bond from a Surety Company authorized to do business in Pennsylvania or a certified check made to the order of Brentwood Borough. The Bid Bond or certified check shall be equal to ten percent (10%) of the total amount of the Proposal as a guarantee that, if the Proposal is accepted, the successful Bidder will enter into an Agreement within 15 days after a Notice of Award is issued by the Borough. The responses provided in the proposal must remain valid for a period of no less than sixty (60) days from the date of the bidding opening. No Bidder may withdraw a Proposal during the sixty (60) day period without forfeiting the bid bond amount. The Borough reserves the right to reject any or all proposals, or any part thereof, for any reason, and also reserves the right to waive any informality therein. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered Bid Result Base Bid - Contract A Advanced Pipe Technologies $955,206 Base Bid - Contract B Soli Construction, Inc. $390,175.00

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects