Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

November 22, 2024

February 1, 2026

Multiple Locations

Demolition, New Construction, Site Work

No Information to Display

$4,300,000.00

Public - City

img_map_placeholder

Multiple Locations, Port Royal, PA

32

40

13

4

Subscribe to View Full Documents

The General Construction Project is generally described as: Construction of a new oversized Wet Well for the 1st Street Pump Station Construction of a new Vertical Screen at the 1st Street Pump Station Installation of 3 new Raw Sewage Pumps at the 1st Street Pump Station Demolition of the existing 1st Street Pump Station and Wet Well Improvements to the 3rd Street Pump Station including 2 new pumps Construction of new forcemains from the 3rd Street Pump Station to the 1st Street Pump Station and from the 1st Street Pump Station to the Bergstresser WWTP (a total of 850 feet of 3-inch line and 900 feet of 6-inch line) Construction of a new Waste Sludge and Decant Valve Vault Construction of a new Ultraviolet Disinfection Facility and Pole Building Demolition of the existing Chlorine Contact Tank Construction of a new Effluent Meter Pit, Composite Sampler and associated systems The Electrical Construction Project is generally described as: Construction of Emergency Generator, Automatic Transfer Switch and associated switchgear complete in all regards at the 1st Street Pump Station Connections of the 1st Street Pump Control Panel and Vertical Screen Control Panel Connection of the 3rd Street Pump Control Panel, Decant Motor Operated Valves, Ultraviolet Disinfection System Control Panel and Effluent Meter/Effluent Composite Sampler Panel from the existing Motor Control Center at the Bergstresser WWTP A certified check or bank draft payable to the Port Royal Municipal Authority or a satisfactory Bid Bond executed by the Bidder will serve as an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid. Bid security and a fully completed Non-Collusion affidavit shall be submitted with each bid. Procedures for submitting bids and other pertinent information are contained in the Instructions to Bidders and other contract documents. The OWNER reserves the right to reject any or all bids, to waive any bid irregularities, and to negotiate contract amounts. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects