Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 24, 2024

December 3, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$525,000.00

Public - City

img_map_placeholder

Multiple Locations, Rancho Cucamonga, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe to View Full Documents

The scope of work to be performed consists of, but not limited to, removal and replacement of existing concrete sidewalk, curb and gutters, drive approaches, asphalt pavement and other related work as noted on the Appendices. The contract documents call for 40 working days to complete the Base Bid item construction. However, additional working days will be added to the project length for each Additive Bid item awarded, if any. The bidder must submit with his proposal, cash, cashier's check, certified check, or bidder's bond, payable to the City of Rancho Cucamonga for an amount equal to at least 10% of the amount of said bid as a guarantee that the bidder will enter into the proposed contract if the same is awarded to him, and in event of failure to enter into such contract said cash, cashiers' check, certified check, or bond shall become the property of the City of Rancho Cucamonga. The amount of the bond to be given to secure a faithful performance of the contract for said work shall be 100% of the contract price thereof, and an additional bond in an amount equal to 100% of the contract price for said work shall be given to secure the payment of claims for any materials or supplies furnished for the performance of the work contracted to be done by the Contractor, or any work or labor of any kind done thereon, and the Contractor will also be required to furnish a certificate that he carries compensation insurance covering his employees upon work to be done under contract which may be entered into between him and the said City of Rancho Cucamonga for the construction of said work. The City of Rancho Cucamonga, reserves the right to reject any or all bids. Question Deadline 09/10/2024 at 12:00 PM PT Questions regarding this Notice Inviting Sealed Bids for "CITYWIDE CONCRETE REHABILITATION PROJECT FY 24-25" shall be in writing (e-mail prefer to Richard Favela and Kenneth Fung) The City will upload responses to any questions received to this project's online webpage by noon on Tuesday, September 17, 2024.

48 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects