Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

November 18, 2024

No Information to Display

1301 S Pkwy Dr

New Construction, Site Work

No Information to Display

$16,788,360.00

Public - City

img_map_placeholder

1301 S Pkwy Dr, Alvarado, TX

245

28

202

2

Subscribe to View Full Documents

Back Use of this site is governed by our Terms of Use agreement. If you have any questions please send an email to the administrator. The work included in this Section consists of the furnishing of all labor, instruments, tools and services required in connection with the Testing, Adjusting and Balancing (TAB) of the Heating, Ventilating and Air Conditioning (HVAC) systems as described in the mechanical specifications and shown on the mechanical Drawings, or reasonably implied therefrom, to include the overall commissioning of systems and subsystems such as verification of operation of each control device and all equipment sequences of operation. B. TAB of the HVAC systems will be performed by an impartial Technical Firm who is a member of the Associated Air Balance Council (AABC) and whose operations are limited only to the field of professional TAB work. TAB firm shall be selected by owner and general contractor shall include the allowance noted in the front-end proposal requirements and shall pay the associated TAB firm from this allowance. C. TAB Firm is responsible to and shall submit all reports directly to the Architect/Engineer and Owner. D. TAB services shall result in the optimum temperature, humidity, airflow, pressurization, ventilation rates, and noise levels in the conditioned spaces of the building. E. The following basic components of the HVAC systems shall be tested, adjusted and balanced: 1. Air distribution systems. 2. Air moving equipment. 3. Cooling systems. 4. Heating systems. 5. Domestic hot water recirculating pumps and related balancing valves. 6. HVAC control systems verification to include end devices, control sequences of operation and energy management system control and monitoring point verification.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects