Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 28, 2024

June 5, 2025

US-80

Outdoor Lighting, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

US-80, Pearl, MS

2

Subscribe to View Full Documents

The work generally consists of the following items: 1. Installation of roadway lighting along U.S. Hwy 80 from the intersection of Pearson Road to the intersection of Pirate Cove. The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. Contract time shall be 220 consecutive calendar days from the effective date shown in the Notice to Proceed. Liquidated damages will be assessed at a rate of $800.00 per day for each consecutive calendar day when the work has not achieved Final Completion. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Each Bidder must deposit with his proposal, a Bid Bond or Certified Check in an amount equal to five percent of his bid, payable to the City of Pearl, as bid security. Bidders shall also submit a current financial statement, if requested, by the City of Pearl. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of one hundred percent (100%) of the contract amount. The City of Pearl reserves the right to reject any and all bids and to waive any informalities or irregularities therein. Question Deadline 09/22/2024 Written requests for interpretation of the Plans and Specificationsshall be submitted to the Engineer (ATTN: Chad Edwards, P.E.), by electronic mail: chad.edwards@neel-schaffer.com, no later than four days prior to opening of the Proposals

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.