Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2024

October 7, 2024

November 21, 2024

2800 Dogtooth Ln NW

Renovation

No Information to Display

$54,500.00

Public - State/Provincial

img_map_placeholder

2800 Dogtooth Ln NW, Olympia, WA

5

7

3

Subscribe to View Full Documents

ESTIMATED BASE BID COST RANGE: $45,000 to $65,000 SCOPE OF WORK: Line existing duct work in the House of Welcome Cedar room Please direct, questions regarding this project, to the office of the Consultant: Jerry Osborn, OAI Architects + Planning, josborn@oaips.com (206) 920-6348, 24 hours following bid opening, bid results will be available by e-mailing The Evergreen State College Public Records Request Office at publicrecords@evergreen.edu and requesting a copy ofthe results. Voluntary numerical MWBE goals of 10% MBE and 8% WBE have been established for this project. Achievement of the goals is encouraged. However no minimum level ofMWBE participation shall be required as a condition of contract award. Bids will not be rejected or considered nonresponsive ifthey do not include MWBE participation The State reserves the right to accept or reject any or all proposals and to waive informalities *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK A. Work under this Contract includes furnishing of all Type of Contract: 1. Project will be constructed under a single prime contract.ACCESS TO SITE A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section. B. Use of Site: Limit use of Project site to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. 1. Limits: Confine construction operations to the area around the Longhouse 2. Driveways, Walkways and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances by construction operations. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weather tight condition throughout construction period. Repair damage caused by construction operations.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.