Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

May 20, 2025

No Information to Display

3300 Golf Rd

Paving, Site Work

No Information to Display

$600,000.00

Public - County

img_map_placeholder

3300 Golf Rd, Brookfield, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

The Chicago Zoological Society (CZS) is seeking professional Design/Build services for an asphalt V.I.P. Parking Lot at the west end of South Gate Parking Lot at Brookfield Zoo Chicago. Question Deadline 09/11/2024 at 5:00 PM CT All question(s) must be submitted in writing in your email. Purchasing@brookfieldzoo.org. Notice to Award: Early October The Scope Includes: Design Development Phase o Perform a site assessment with key CZS staff to define the project requirements o Develop a design schedule with milestones o Develop a concept design for review and approval by CZS o Concept design to include, but not limited to, topographic survey, Site research and private underground utility services locating. o The contractor is responsible for retaining the necessary sub-consultants required to execute the design process. CZS has the right to review and reject any sub-consultants proposed for the project. o Create a full set of design documents from schematic design through construction documents o Coordinate the project work with the CZS project Management team and complete the project in accordance with CZS's goals and objectives and agree upon Scope, cost, time, and quality. o Chair regular scheduled meetings with CZS internal project team. The minimum schedule will include a kick-off meeting and subsequent meetings scheduled at intervals of at least 30/60/90/100% during exhibit design development. o As part of the design development phases, the contractor will be responsible for providing cost estimates at 50% Schematic Design, 50% at Design Development and 50% at Construction Documents. If at any time, the design exceeds the target budget, the contractor is responsible for re-aligning the design with the budget. o During design development, the contractor will work closely with Plant and Facilities to develop the design parameters for the parking lot. o Develop "For-Construction" bid ready plans and project specifications for construction sub-contractors. Provide copies of all bid documents to CZS Procurement. o Specifications for Bid documents should include, but not be limited to the following: Bidding and Contract Documents, Insurance and Liability Requirements (must meet or exceed CZS standard Insurance and Liability Requirements for

86 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.