Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

November 1, 2024

July 3, 2025

7285 Bell Rd

Renovation

No Information to Display

$380,000.00

Public - City

img_map_placeholder

7285 Bell Rd, Johns Creek, GA

59

32

64

5

Subscribe to View Full Documents

Reference Number 0000361020 Job Location 7285 Bell Road Johns Creek GA 30097 Question Deadline 09/26/2024 at 5:00 PM ET Questions are submitted online Yes. Questions must be asked electronically . Work shall include all include materials, and construction of the Cauley Creek Park Maker Space Phase 1. Work includes but is not limited to selective demolition of roof and interior elements of an existing metal building, as well as installation of a new roof, installation of heating/air conditioning and construction of interior and exterior elements. The building is located at 7285 Bell Road, inside Cauley Creek Park (7255 Bell Road). The existing building previously served as a water reclamation facility, and interior equipment has already been removed. Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Anticipated NTP November 1st, 2024 Completion Date July 3rd, 2025 SCOPE OF WORK The Contractor shall construct the project per: o The Contract Documents including but not limited to the scope of work and specifications; o The Plans - drawings/details/notes; o Project Manual o Purchase Order; o Approved Schedule; o City of Johns Creek ordinances and regulations; o OSHA standards and guidelines; o Any other applicable codes, laws and regulations including but not limited to Section 45-10-20 through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil Rights Act, Drug-Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act of 1990 The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work. The contractor will be responsible for constructing all improvements shown on the plans unless specifically noted otherwise in the specifications/plans. The contractor is responsible for inspecting the jobsite prior to submitting a bid. No change orders will be issued for differing site conditions. In case of discrepancies between the plans and specifications, the most stringent prevails

65 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects