Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2024

November 6, 2024

September 1, 2025

350 Cumberland Hill Rd

Outdoor Lighting, Site Work

No Information to Display

$700,000.00

Public - City

img_map_placeholder

350 Cumberland Hill Rd, Woonsocket, RI

70

39

5

Subscribe to View Full Documents

Reference Number 0000361147 The work generally includes, but is not limited to the following: Construction of a Multi-Use Synthetic Turf field, track, throwing events area, field lighting, spectator areas, stormwater management systems, utilities, and other work within the Project Limits as indicated on site plans. General Requirements - Bidder /Preregistration Required - Bid Deposit Required - Federally Funded - FOB Destination - Installation Required - Insurance Required - Material Safety Data Sheets Required - Prevailing Wage Required - Safety Standards Plan Award Requirements - Reserve Rights to Award by Line Item Question Deadline 09/13/2024 at 4:30 PM ET Questions are submitted online No. Questions regarding this solicitation should be submitted via email to Ken Allaire, Purchasing Agent, at ken.allaire@woonsocketri.org and Joe Weed, Engineer Representative, at jweed@parecorp.com. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Bid Bond: Vendors responding to this solicitation must furnish, with their bid proposals, either a bid bond from a surety licensed to conduct business in the State of Rhode Island or a certified check payable to the City of Woonsocket in the amount of five percent (5%) of the vendor's cost proposal. Performance/Payment Bond: The successful bidder must furnish one hundred percent (100%) payment and performance bonds from a surety licensed to conduct business in the State of Rhode Island prior to issuance of a purchase order. Project Timeline: The project must be substantially complete prior to September 1, 2025. Withdrawal of Bids: No bidder may withdraw their bid within sixty (60) days after the actual time and date of the bid opening thereof. Rejection of Bids: The City reserves the right to cancel this ITB, award on the basis of cost alone, accept or reject any or all bids, in whole or in part. The City further reserves the right to waive as an informality any irregularities contained in any bid not affecting substantial rights that may be in the City's best interest. Bids found to be technically or substantially nonresponsive at any point in the review process will be rejected and not considered further. Any such decision will be considered final. Bid date notes: Physical bids must be submitted in duplicate, placed in a sealed envelope and identified with the following information: "CASS PARK ATHLETIC FACILITIES, Bid No. 6269" including the name of the company submitting the bid. The work, in general, consists of the following: 1. Survey and stake the stormwater basin, limit of disturbance, and location of the sedimentation barriers. 2. Place sedimentation barriers as shown on the plans and staked in the field. 3. Install the construction entrance. 4. Strip and stockpile the top and subsoil as indicated on the plans. 5. Clear and grub areas for work. 6. Begin construction for the improvements (excavating and grading). 7. Excavate to subgrade. Use suitable on-site material in areas where fill is required to bring the surface to subgrade. 8. Install stormwater conveyance and collection system. 9. Install perforated subdrain piping. 10. Construct walls, curbs, fencing, and other improvements as indicated on the plans. 11. Fine grade subgrade layer as indicated on the plans. Care shall be taken to not over compact subgrade layer. 12. Fine grade athletic fields and all disturbed areas. 13. Excess stockpile material shall be removed and disposed of off-site in accordance with all local, state, and federal regulations. 14. Restore the temporary stockpile area to meet or exceed existing conditions. 15. Clean and flush all drain pipes. 16. Sod areas as indicated on the plans. 17. Loam and seed all disturbed areas. 18. Following site stabilization, remove and dispose of all accumulated sediment from the stormwater management system. 19. Clean and flush all drain pipes. 20. Remove the temporary construction entrance and sedimentation barriers.

56 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects