Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

November 25, 2024

October 21, 2026

FL-5

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

No Information to Display

$15,818,997.00

Public - State/Provincial

img_map_placeholder

FL-5, North Palm Beach, FL

115

9

5

Subscribe to View Full Documents

Counties: Palm Beach Road Name: SR 5 (US 1) Limits: Over Earman River (C-17) Bridge No 930003 Project(s): 44289125201(*) Federal Aid No: D422004B Project(s): 44289125202 Federal Aid No: N/A Total Roadway Length: 0.149 Miles Total Bridge Length: 0.026 Miles Total Proposal Length: 0.175 Miles Contract Days: 695 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 70 Days Please read the full advertisement Description: The Improvements under this Contract consist of but are not limited to, MOT (standard, special detour, temporary crash cushion, temporary separator, temporary RPM, temporary signalization and maintenance, temporary traffic detection and maintenance, traffic control officer), bridge (removal, approach slab, substructure, superstructure), concrete (removal, gravity wall, endwall, curb and gutter, curb, valley gutter, traffic separator, sidewalk, driveways), riprap, rubble, bedding stone, earthwork (excavation, embankment), widening, asphalt (milling and resurfacing, driveway maintenance, miscellaneous), guardrail (general, pipe rail, transition, removal, end treatment), signing (single-post, panel, internally-illuminated), pavement markings(painted, patterned, detectable, thermoplastic, permanent tape, bike lane, RPM), lighting (conduit, pull/splice box, junction box, service pole, conductors, load center, pole complete, distribution system), signalization (conduit, signal cable, pull/splice box, power service, service wire, concrete pole, aluminum pole, vehicular signal, vehicular loop detection, pedestrian detection, pedestrian signal), ITS (fiber optic cable, maintenance, new installation), drainage (inlets, pipe culvert), utilities adjustments (manhole, valve box), protections (sediment barrier, floating turbidity barrier), amenities (planter, bench, trash receptacle), and sod along State Road 5 (US-1) from State Road 850 (Northlake Boulevard) over Earman River Bridge No. 930003 (C-17) to Anchorage Drive South for 0.175 miles in the City of North Palm Beach, Palm Beach County. Question Deadline 09/18/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 013 - Bridge Replacement - SR 5 (US 1)

80 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects