Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

January 6, 2025

October 17, 2025

Multiple Locations

Demolition, New Construction, Paving, Site Work

No Information to Display

$6,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Dover, DE

91

6

2

6

Subscribe to View Full Documents

DBE Goal : 15% Disadvantaged Business Enterprise Goal Location : New Castle County These improvements are more specifically shown on the Location Map(s) of the attached Plans The improvements consist of furnishing all labor and materials for this project which involves the replacement of the existing Bridges 1-488N&S, which are concrete arches. The proposed bridges will be adjacent prestressed concrete deck bulb tee beams on stub abutments. Additional work includes raising the roadway profile of US13 by reconstructing the roadway approaches, installing guardrail, and placing riprap in the stream for scour protection. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. COMPLETION TIME: All work on this contract must be complete within 284 Calendar Days. Extensions of contract time due to weather are specified in the Standard Specifications Section 108.7F, weather days. It is estimated a Notice to Proceed is issued such that work starts on or about January 6, 2025. Question Deadline 09/16/2024. Questions regarding this project are to be e-mailed to dot-ask@delaware.gov no less than six business days prior to the bid opening date in order to receive a posted response. Please include the Contract number in the subject line. Questions and responses are posted electronically. The date of the final posted Questions and Answers document must be entered on the submitted Certification Form. Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. PERFORMANCE-BASED RATING SYSTEM - 29 Del.C. $6962 (c)(12)(a) requires DelDOT to include a performance-based rating system for contractors. The Performance Rating for each Contractor shall be used as a prequalification to bid at the time of bid. Refer to 'General Notices' for details. DEDOT - BR 1-488N&S On N001 US13 Over Blackbird Creek

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.