Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

November 19, 2024

May 21, 2026

Little River Turnpike

Paving, Site Work

No Information to Display

$6,000,000.00

Public - County

img_map_placeholder

Little River Turnpike, Fairfax, VA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Fairfax County is soliciting pre-bid qualification applications for the construction of the Little River Turnpike Walkway (Eastbound) project. The project is proposed to extend a variable width sidewalk along the south side of Little River Turnpike between Hillbrook Drive and Little River Run Drive to have a continuous pedestrian travel path. The scope of work also includes but is not limited to a 1,629-foot-long variable width walkway, two concrete bus pads with shelters, street and pedestrian signal improvements at the intersection of Little River Turnpike and Evergreen/Hillbrook, storm sewer main and structure improvements along Little River Turnpike, replacement of approximately 840 feet of water main including 812 of 6", 36' of 8", and 36' of 30" main, signage and markings, and a 259-foot retaining wall with sections requiring soldier piles. The construction cost for this project is estimated to be between $4 million to $6 million. The estimated duration for the construction of this project will be 548 calendar days. The anticipated date for the Construction Authorization is estimated to be winter 2024 and the Substantial Completion date is estimated to be summer 2026. These are estimated dates and durations and are subject to change. Only firms that have been pre-qualified are eligible to submit bids for this project. Bids received from those who have not been pre-qualified will not be considered. This is a UNIT price Contract. Question Deadline 09/11/2024 All questions concerning this Pre-qualification Application procedure shall be submitted in writing to online. The Board of Supervisors of Fairfax County, Virginia reserves the right to reject any and all Applications, and to waive informalities and irregularities in the Pre-qualification Application procedure. Contractor's License: A statement of applicant's ability to acquire a Virginia Class A Contractor's License with appropriate specialty classification, if currently unlicensed, prior to bidding; and a commitment to require that all affected subcontractors obtain applicable Virginia licenses. The County reserves the right to extend the Application submission deadline, by way of an addendum, should such action be deemed in the best interest of Fairfax County. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.