Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2024

October 14, 2024

July 25, 2025

2987 Harper-Westfall Rd

New Construction, Renovation, Site Work

No Information to Display

$8,430,000.00

Public - City

img_map_placeholder

2987 Harper-Westfall Rd, Harper, OR

138

28

36

4

Subscribe to View Full Documents

New Gymnasium, Locker room, Kitchen and Cafeteria . The scope of this project includes a (Base Bid) new 17,677 square foot gymnasium, locker room, kitchen and cafeteria with an (Add Alternate No. 1) 7,415 square foot classroom wing. The project shall include a pre-engineered metal building gymnasium with wood framed construction for the cafeteria and kitchen. The Scope of Work shall include, but not limited to the following: pre-engineered metal building system, wood framed construction, interior finishes, fixtures, specialties, mechanical, HVAC, plumbing, electrical, fire alarm system, and site improvements all as required by, specified in, and shown on the Contract Documents. Question Deadline 09/05/2024 at 5:00 PM MT, Deadline for Questions and Subsitution Requests: Clarifying Questions and Substitution Requests Must Be Submitted to Ron Polintan, Lkv Architects, Email: Ron@ikvarchitects.com. Questions and Substitution Requests Received After That Time and Date Will Not Be Answered. Substitution Requests May Only Be Submitted by Contractors That Attended the Pre- Bid Conference. BID DOCUMENTS FOR CONTRACTORS: Electronic bid documents are available by contacting Ron Polintan, Project Architect, LKV Architects. 208-336-3443 Email: ron@lkvarchitects.com Furnish and install all materials and equipment and provide all labor required and necessary to complete the work shown on the drawings and/or specified in all Sections of Division 26 and all other work and miscellaneous items, not specifically mentioned, but reasonably inferred for a complete installation, including all accessories required for testing the system. It is the intent of the drawings and specifications that all systems be complete and ready for operation.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.