Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 11, 2024

September 30, 2024

October 27, 2024

680 Division St

Site Work

No Information to Display

$41,000.00

Public - City

img_map_placeholder

680 Division St, Charlevoix, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

Estimated value is $30,000 to $40,000. The structure is a 300,000-gallon spheroid elevated water storge tank with a high-water level of 148 ft. located at 680 Division St. in Charlevoix, Michigan. Repairs: 1) Replace the wet interior roof hatch. 2) Install a cover over the condensate and top platform openings. 3) Replace the condensate drain line. 4) Overflow discharge modification. 5) Install fall prevention devices on the wet interior and basebell ladders. 6) Replace roof vent with a pressure vacuum vent. 7) Install a roof handrail with a painter's railing. 8) Weld a rigging lug on the transition cone. 9) Replace the corroded anchor bolt nuts. Liquidated damages are applicable and begin after 14 days out-of-service or after Substantial Completion date whichever is the earlier date. Liquidated damages at $1,250/calendar day is to apply after this date. Ready for Final Payment Date is to be thirty (30) days after date Substantial Completion Date based on out-of-service days or scheduled Substantial Completion, or as adjusted by Change Order, or actual Substantial Completion if earlier. Liquidated damages after Ready for Final Payment Date of $250/day is to apply. Liquidated damages are cumulative if damages from Substantial Completion and Ready for Final Payment overlap. Commence work on or after September 30, 2024. Substantial Completion by October 27, 2024, including cure and disinfection time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects