Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

November 20, 2024

May 6, 2025

To Be Determined

Site Work

No Information to Display

$250,000.00

Public - Federal

img_map_placeholder

To Be Determined, Pagosa Springs, CO

6

5

5

2

Subscribe to View Full Documents

** NOTICE: This solicitation has been amended, please review ALL the new documents attached to this announcement. A bid bond/offer guarantee will be required for this project. Offeror proposals and all associated documents shall be submitted to the U.S Forest Service via EMAIL ONLY to elizabeth.ratcliff@usda.gov. No USPS/FedEx/UPS (Snail mail) proposals will be accepted. Project Title: San Juan Bridge Campground Road & Spur Deferred Maintenance (GAOA) The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete this project. Set Aside: Total Small Business Set-Aside (FAR 19.5) Project Magnitude: Between $150,000 to $200,000 Location: From Pagosa Springs travel West on US-160 for 2.7 miles, turn right onto Piedra Rd and continue for 18.8 miles. Bridge Campground will be located on the right. The campground is located at Latitude 37.46235, Longitude -107.19865. Period of Performance: The work is anticipated to commence 60 days after receiving the Notice to Proceed (NTP) sometime in late 2024 or early 2024 and completing the project no later than April 25, 2025. The work is expected to be completed within 60 days after the work is started. Site Visit/Pre-Bid Meeting: Not mandatory but encouraged, no government escort will be present. Contractor Questions Due No Later Than: 8/30/2024 12:00 MDT. Use document titled "Contractor Questions and Answers Template" to write down your questions and send it to elizabeth.ratcliffusda.gov before 8/30/2024 12:00 MDT. Request for Proposal Solicitation Close Date: 9/11/2024 12:00 PM MDT. Instructions to Bidders: See Section L. Evaluation/Award Factors: See Sections L&M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects