Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2024

October 14, 2024

No Information to Display

808 Ridge Ave

Renovation

No Information to Display

$65,202.00

Public - State/Provincial

img_map_placeholder

808 Ridge Ave, Pittsburgh, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Provide all labor, material, equipment, permits and supervision required to replace four sets of interior doors at the Allegheny Campus Library Building, 808 Ridge Ave., Pittsburgh, PA 15212. For technical questions contact Jack Bostrom (jbrostrom@ccac.edu) at (412) 237-2517. For procedural questions, contact Mike Cvetic (mcvetic@ccac.edu), Director of Purchasing, at 412-237-3146 Estimate Range: $25,000 - $50,000 X Bid Bond. . . . . . . . . . . . . 10% of total base bid amount (Submit with Bid) X Performance Bond. . . . . 100% of total contract amount (Awardee Only) X Payment Bond. . . . . . . . 100% of total contract amount (Awardee Only) PERFORMANCE BOND: The successful bidder will be required to enter into a written contract with the College and to furnish a contractor's bond conditioned for the faithful and full performance of the contract with sufficient surety in the amount stated above. Any surety cosigning the contractor's bond shall be an Incorporated surety company approved by the Court of Common Pleas of Allegheny County. Bond with surety must be furnished within 20 days after receipt of the contract. The Board of Trustees reserves the right to reject any bond furnished where it is in the best interest of the College to do so. BID BOND: Bid must include the required bid bond or certified check, which will be returned to the unsuccessful bidder approximately 45 days after the bid due date. PAYMENT BOND: The bidder to whom the contract is awarded shall furnish a bond to guarantee the payment of third-party subcontractors involved in fullment of services rendered against College contracts. Such bonds shall be with sufficient surety and in the amount stated above. Failure on the part of the contractor to furnish such bond shall be just cause for cancellation of award. NO LIEN AGREEMENT AND/OR INSURANCE CERTIFICATES: As required by the College, the No Lien Agreement and/or Insurance Certificate may be requested of the successful bidder. The board of trustees reserves the right to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects