Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

October 25, 2024

August 6, 2025

Multiple Locations

Site Work

No Information to Display

$400,000.00

Public - County

img_map_placeholder

Multiple Locations, Mandeville, LA

61

19

15

3

Subscribe to View Full Documents

Dominion and Highland Oaks Sewer Consolidation It is the Vendors responsibility to check online, or LaPAC frequently for any possible addenda that may be issued. The Parish is not responsible for a Vendors failure to download any addenda documents required to complete a submission. Each paper bid must be submitted in a sealed envelope. The outside of the envelope shall show the Name and Address of the Bidder, the State Contractors License Number of the Bidder (if the work is estimated at $50k or more), the Bid Name and the Bid Number. Inquiry Deadline September 16, 2024 2:00 PM any questions or inquires must be submitted via fax to 985- 898-5227, or via email to Procurement@stpgov.org. SCOPE OF WORK The Contractor shall set up necessary construction facilites including storage areas, temporary facilities, Contractor's field offices and such sanitary and other facilities as are required by local or state law or regulation; all as required for the proper performance and completion of the Work. A. The Contractor shall provide all items of work covered in this Section which shall include but not be limited to the following principal items: 1. Establishment on site of all Contractor's field offices, facilties, and equipment required for the first month of operation. 2. Installation of temporary construction power, wiring, and lighting facilities. 3. Development of construction water supply. 4. Provision of on-site sanitary facilities and potable water facilities as specified. 5. Establishment of Contractor's work and storage yard. 6. Procurement and submittal of all required subcontractor insurance certificates and bonds. 7. Obtaining all required permits. 8. Posting of all OSHA required notices and other information as required by Federal, State and Local Agencies. 9. The Contractors superintendent established at the job site full time. 10. Provision of a detailed construction schedule acceptable to the Owner for project use as specified

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects