Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 7, 2024

September 4, 2025

9710 NW 58th St

Remodeling

No Information to Display

$500,000.00

Public - County

img_map_placeholder

9710 NW 58th St, Doral, FL

13

3

2

3

Subscribe to View Full Documents

ESTIMATED COST: $500,000.00 LICENSE REQUIREMENT: General Building Contractor The work, in general consist of One entire Project divided in to 3 Phases - Contractor is required to include in project estimate cost the rental fees of (2) FortsUSA space (20'x20') for the entire project duration to accommodate MDFR Fire Station staff during construction. Phase 1 consists of complete ADA Bathroom/Battalion Dorm remodeling. The new Dorm/ Bathroom area remodeling inclusive of demolition, fabrication and installation of new partition walls, new doors, & flooring etc. inclusive of new Plumbing, Electrical, Mechanical and Fire Sprinkler work as mentioned and described herein noted on the Project contract drawings FS #45 - Bath & Dorm Plans Phase 1 consisting of six (6) Sheets D-1.0, A-1.0, A-3.0, E-1.0, P-1.0, and FP-1.0. The contractor shall protect active Fire Station with proper visqueen or construction material, for dust & noise protection/control, for each of the Project Phases. Phase 2 consists of complete Kitchen remodeling as mentioned above. The proposed Interior Kitchen space will be totally remodeled to receive a complete makeover with new Terrazo flooring & baseboard, Electrical, Plumbing, Mechanical components as well as (16 Ga.) Stainless Steel cabinets, counter tops and backsplash full height inclusive of New Kitchen equipment's & appliances as mentioned and described herein noted on the project contract drawings FS #45 - Kitchen Phase 2 consisting of four (4) Sheets D-2.0, A-2.0, A-3.1 and MEP-2.0. The contractor shall protect active Fire Station with proper visqueen or construction material, for dust & noise protection/control, for each of the Project Phases. During this project phase, MDFR will provide usage of temporary movable kitchen for station use. Phase 3 consist of the removal and disposal of existing floor tiles & baseboard, located in the Lobby area, interior corridor and dining/day room to be replaced with new Terrazo flooring and baseboard. FS #45 - Flooring Phase 3 consisting of one (1) Sheet A-3.2. prepared in-house by MDFR-Miami-Dade Fire Rescue, Design & Construction Division. The project Station is located at 9710 NW 58th Street, Fl. 33178. This project is covered under the Cone of Silence. Any questions pertaining to this project must be submitted in writing to the Project Manager. Please email all questions to: ALBERTO. PERDIGON@miamidade.gov. and BENEDIT@miamidade.gov, coping the Clerks of the Board at CLERKBCC@miamidade.gov. Question Deadline 09/05/2024 at 5:00 PM ET

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.