Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

November 1, 2024

24 Russell Rd

Renovation

No Information to Display

$27,500.00

Public - City

img_map_placeholder

24 Russell Rd, Huntington, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The Town of Huntington seeks written responses from qualified contractors to furnish and install an air conditioning/heat pump ductless split system at the Police Garage. The Town reserves the right to reject any or all responses if it is deemed in the best interest of the Town. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 09/16/2024 For questions regarding this Request for Written Responses, please contact: Jennifer Peloquin - Town Administrator admin@huntingtonma.us Contractor shall furnish and install an air conditioning/heat pump ductless split system at the Police Garage located at 7 Mill Street, Huntington, MA with the following specifications: Two (2) outdoor air conditioning/heat pump condenser units o 30,000 BTUs each o Units are to be mounted on an 18" stand or wall bracket in an approved location outside the garage. Two (2) indoor ductless air conditioning/heat pump wall mounted units o 30,000 BTUs each o Units are to be mounted in an approved location inside the garage. Two (2) wireless remotes Two (2) compatible wall thermostats System must meet the following ratings: o SEER - 18.5 o EER - 12.8 o HSPF - 9.6 New copper tubing and fittings to complete the refrigeration piping between the outdoor units and indoor units. The refrigeration piping will be insulated and have flared connections. Any of the refrigeration piping that is visible on the outside walls will be hidden in piping covering. New plastic tubing and fittings to pipe the indoor units' condensate drains to an approved location outside the building. All electrical wiring to complete the system Disconnection of exiting oil-fired furnace. Exhaust pipe to be cut and capped in garage. Furnace will be left at the garage for the town to dispose of. All work must be completed by November 1, 2024.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects