Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

No Information to Display

4255 US-85

Renovation

No Information to Display

$400,000.00

Public - City

img_map_placeholder

4255 US-85, Castle Rock, CO

7

3

4

Subscribe to View Full Documents

Reference Number 0000360244 Job Location: 4255 US Hwy 85 Castle Rock, Colorado United States 80108 Question Deadline 09/09/2024 at 12:00 AM MT Questions are submitted online Yes Bid Intent Deadline 09/16/2024 12:00 AM MT Scope of work for the 4" DIP Sludge Recirculation Piping Project at Plum Creek Water Reclamation Authority facility is as follows: Provide all supervision, coordination, labor, material, and equipment to install a new, second, common 4" discharge header at the existing centrifuge feed pumps. This header will feed three new 4" recirculation lines one for each of the three SNDR (Storage Nitrification Denitrification Reactor) tanks. Each of the three recirculation lines shall have a new manual isolation plug valve installed in the pump room upstream of penetrating the pump room wall above the existing pump suction lines. Piping shall be 125# flanged ductile iron, cement lined, and field coated with 10 mils high solids amine, polyamide, or polyamidoamine epoxy coating. To include all cored penetrations, double link-sealed with stainless steel hardware. Pipe supports to match existing. Installation coordinated with plant operations. Recirculation discharge centerline elevation into SDNR tanks ~5984.50. New pump discharge header centerline elevation ~5971.17. Existing suction piping centerline elevation ~5973.21. Tank Recirculation piping for SDNR #3 (Future) to be priced as Alternate #1. Alternate #2 to include installing two 4" ductile iron flanged tees and one plug valve on the existing centrifuge feed lines in the solids trailer room. Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Installation Required - Insurance Required - License Required - Local Service Required Bonding Requirements - Performance Bond 100 % - Labor and Materials Bond 100 %

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.