Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 18, 2024

September 23, 2024

September 30, 2024

To Be Determined

Renovation

No Information to Display

$200,000.00

Public - Federal

img_map_placeholder

To Be Determined, Wright Patterson AFB, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The Contractor shall design, acquire, install, integrate, test and deliver an AFI 31-101 and Integrated Base Defense Security System (IBDSS) Capability Development Document (CDD) compliant alarms and assessment system which will provide automatic display upon alarm activation and will be available for manual request by the operator. In addition. It will also include a Video Storage System (VSS) that will show a minimum of three to five seconds of pre and post alarm video for each alarm to assist in determining the cause of the alarm. IAW AFI 31-101, all components (cameras, digital video recorder, etc.) must be sourced from the current version of the current Non-Nuclear Configuration Management Database Equipment Approval List. Closed-circuit television systems will be monitored in BDOC. FAR 52.232-18 Availability of Funds. Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. Q&A: Can you provide the latest Non-Nuclear Equipment List The list is CUI and cannot be posted in a public setting Is there currently communication /fiber infrastructure at each gate (ECP) location to provide connectivity to BDOC Two strands of fibler are at each location. Will there be any design or layout drawings provided by the government for this solicitation there are no drawings at this time. Is the design intent to have an individual CCTV/VSS monitor system at each ECP with monitoring capabilities only at BDOC Or to have a centralized CCTV/VSS system with monitoring capabilities only at each ECP. Devices/systems installed at ECPs with monitories capabilities at BDOC and if possible any computer that can download the monitoring software/application. Our current set up allows us to monitor cameras from any of our nipr computers with appropriate log in.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects