Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2024

October 28, 2024

September 19, 2025

I-80

Demolition, Outdoor Lighting, Renovation, Site Work

No Information to Display

$994,000.00

Public - State/Provincial

img_map_placeholder

I-80, Greene Township, PA

76

31

55

8

Subscribe to View Full Documents

FM 7588 - Electrical Construction (0.4) Demolition and removal of existing panelboards, transformers and related work at the rest area building. Construction of new electrical panelboards, service entrance equipment, propane-fired generator and automatic transfer switch and connection of existing electrical lighting, heating, ventilation and outlets to the new facilities. At the existing wastewater treatment plant, de-energize all existing electrically powered systems and then demolish and remove all existing electrical facilities inside the existing building except where shown to remain. Construct new electrical system facilities at the wastewater treatment plant building and to the new sewage treatment tanks and machinery as shown. Construct new electrical system facilities at the water treatment plant building and to the new water well pump. Construct site electrical power distribution system between the existing rest area building and new water and wastewater treatment buildings as shown on the construction drawings and as specified along with all requirements to make the systems 100% functional and code compliant for the projects located in Greene Township, Clinton County. 023R331 (RSR33) at Mile Marker 193 (Exit 192) Eastbound on I-80 (contains the existing sewage treatment plant and water treatment plants.) 023R341 (RSR34) at Mile Marker 193 Westbound on I-80. (Exit 199) Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-bid Meeting: Optional Wage Rates: Yes Prequalification Requirement: No State Type of Work: Miscellaneous Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. Direct Any Questions Regarding the Pre-bid Conference Location and Time to CPA John Hoover at 717-418-1352. All Technical and Specific Questions Must Be Asked Through Ecms Only. PennDOT - FM 7588-STP Replacement and Building Upgrades-ELEC *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects