Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2024

October 7, 2024

December 31, 2028

Multiple Locations

Site Work

No Information to Display

$259,000.00

Public - City

img_map_placeholder

Multiple Locations, Marshall, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

2024 - 2028 Turf Restoration. Work under this Contract is restoration of disturbed turf within the City right of way or City property. The City is simultaneous accepting bids for stump grinding of approximately 100 stumps throughout the City of Marshall. The 2024 work under this contract will consist of restoration of the disturbed areas following stump grinding in 2024. Any questions regarding the project shall be brought to the attention of Marguerite Davenport at mdavenport@cityofmarshall.com Questions by telephone call are prohibited. Questions will not be accepted if received less than seven (7) calendar days before the bids are due. Each Proposal shall be accompanied by a cashier's check, certified check, money order or bid bond, payable to the Owner, in an amount not less than five percent (5%) of the amount of the Proposal, as a Bid Security. The Bid Security of the Bidders under consideration will be returned after approval of the Contract by the Owner. All others will be returned after the Proposal opening. The successful Bidder will be required to furnish a satisfactory Performance Bond in the amount of One Hundred Percent (100%) of the Contract. Withdrawal of any Proposal is prohibited for a period of 90 days after the actual date of the opening thereof. The work will commence after the stump grinding contract is started. All stumps slated for removal in 2024 are required to be removed by December 15, 2024. The Owner reserves the right to accept any Proposal, to reject any or all Proposals, to waive any irregularities in any Proposal, and to delete any part(s) in any Proposal in the interest of the Owner. Question Deadline 08/29/2024 Any questions regarding the project shall be brought to the attention of Marguerite Davenport at mdavenport@cityofmarshall.com

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.