Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$145,000.00

Public - City

img_map_placeholder

Multiple Locations, Port Orford, OR

7

8

3

Subscribe to View Full Documents

Sealed bids are requested in a single contract proposal for the roof replacements of the duplexes at 2117 & 2119 Idaho St.; 650, 652, 654, & 656 W. 9th St.; 1041, 1043, 1045, & 1047 W. 12th St.; and one (1) shed at each location (three (3) sheds in total), Port Orford, Oregon 97465. Work consists of the removal of existing composition shingle roofing and felt underlayment and the installation of new underlayment and composition shingle roofing and accessories. Where needed, rotted trim and sheathing may also require replacement.After opening, the bids will be available for public inspection. No bid will be considered unless accompanied by bid security in the form of a Cashier's Check issued in favor of the Owner or a bid bond issued by a bonding company acceptable to the Owner. Bid security must be for 10% of amount of the bid and guarantee bids for a period of thirty (30) days after bid opening. The project is subject to Davis-Bacon Minimum Wage Rate Requirements and related Acts relative to minimum wages. Davis-Bacon Minimum Wage rates and other requirements shall be complied with by the successful bidder and all subcontractors, and appropriate certificates indicating compliance will be required. A copy of the Rate Schedule is included with these Specifications. Within two hours of the bid opening, all bidders to be considered as responsive, shall submit at the above address, a form, disclosing the names, addresses, Construction Contractor's Board numbers, if applicable, of all first-tier subcontractors whose contract value for labor or labor and material exceeds 5% of the total project bid or $15,000, whichever is greater. Coos-Curry Housing Authority may reject any bid not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all bids upon a finding by the Housing Authority that it is in the public interest to do so. Coos-Curry Housing Authority reserves the right to waive minor irregularities in Bid Form upon a finding by the Housing Authority that it is in the public interest to do so. Bid Forms and Subcontractors information will be accepted via hand delivery, mail or email. . The Invitation to Bid bound herein shall be considered a part of these Instructions to Bidders as fully as if herein repeated. 2. Examination of Site and Documents: Before submitting a proposal, the Bidder shall: a. Carefully examine the drawings and specifications. b. Visit the site of the work and fully inform himself of existing conditions and limitations. c. Include in his bid sums, sufficient funds to cover all items required by the Contract Documents, relying entirely upon his own examination in making his proposal. Question Deadline 09/13/2024 Discrepancies between drawings and specifications, omissions, doubt as to meaning, and other questions should be brought to the attention of the Architect not less than six (6) days prior to bid time, and they will be answered by addendum addressed to all Bidders. Questions received less than six (6) days before bids close cannot be answered by addendum.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.