Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 10, 2024

October 10, 2024

December 9, 2024

111 Reynolds Ave

Site Work

No Information to Display

$26,950.00

Public - City

img_map_placeholder

111 Reynolds Ave, Hanover, NJ

5

9

3

Subscribe to View Full Documents

**As of September 23, 2024, This project has not yet been awarded. A timeline for award has not yet been established.** Bee Meadow Pool Pool Chlorine Tank Replacement *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. The Township of Hanover is seeking Quotations for the replacement of a one thousand (1,000) gallon chlorine chemical storage tank and demolition of an eight-inch (8") CMU wall at Bee Meadow Pool. As such, the work may include, but is not limited to: Removal of Existing Chlorine Storage Tank: o Cutting the existing tank into pieces to make removal easier. o Removal of existing lines connected to the tank. Demolition of Existing eight-inch (8") CMU Wall: o Relocation of the existing pumps hanging on the wall prior to demolition. o Repair of the concrete disturbed by the removal of this wall once demolition is complete. o Relocation of the existing mobile stair platform prior to demolition. Installation of new 1,000 Gallon Double-Walled Chlorine Chemical Storage Tank: o Reattaching existing lines to new tank. Work is to be completed within 60 calendar days from the date issued in the Notice-To-Proceed. COA.No- 24GA28037500, 21MH00004200

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.