Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 10, 2024

October 15, 2024

June 30, 2025

3000 Minnehaha Ave

Renovation

No Information to Display

$1,102,481.00

Public - City

img_map_placeholder

3000 Minnehaha Ave, Minneapolis, MN

28

21

3

Subscribe to View Full Documents

3000 Minnehaha Avenue Building Improvements, all in accordance with project documents and specifications. PROJECT DESCRIPTION A. Project Scope: Project consists of, but is not limited to, the following: o Selective demolition of windows, doors, storefront, vestibule, damaged masonry, and miscellaneous facade, glazing, structural, and interior elements. o New windows (curtainwalls) and doors. o New door hardware, where indicated. o Replacement of fiberglass insulated translucent skylight and wall panels. o Repairs to exterior wall(s). o Construction of a new vestibule. Exterior wall will be an insulated brick cavity wall with steel stud (CFS) backup. The roof will be fully adhered thermoplastic polyolefin (TPO) membrane roof over and insulated steel deck. Structural members will be steel. o Replacement of interior glazing and/or storefront at elevator lobbies. o Replacement of a unit heater for the vestibule. o Rough-ins for access control. o Repairs to damaged tile at stair with grout. o Rigging, if needed. o Site/construction logistics, storage, staging, safety, temporary construction, temporary facilities, and security. B. Overall site supervision, project management, administration, and coordination of the Project will be the responsibility of the Prime Contractor.SCOPE A. The Prime Contractor shall supply all labor, materials, transportation, apparatus, and tools necessary for the entire proper completion of this Work: and shall install, maintain and remove all equipment for the proper execution of the Contract, and shall be responsible for the safe, proper and lawful performance of their equipment, maintenance use of the same, and shall perform in the best manner, and everything properly incidental thereto, as stated in the Contract Documents or reasonably implied therein. Question Deadline 09/04/2024 at 2:00 PM CT

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.