Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

November 1, 2024

August 1, 2025

1100 North Ave

Addition, Demolition, Renovation

No Information to Display

$10,000,000.00

Public - State/Provincial

img_map_placeholder

1100 North Ave, Grand Junction, CO

6

11

4

7

Subscribe to View Full Documents

Reference Number 0000360926 Job Location: Colorado Mesa University Main Campus 1100 North Avenue Grand Junction, Colorado United States 81501 Colorado Mesa University (CMU) is soliciting the submittal of proposals from qualified firms to provide Construction Management/General Contracting (CM/GC) services for the Performing Arts Renovation and Expansion Project located on the CMU Campus in Grand Junction, Colorado. The Moss Performing Arts Building was constructed in 1968 and is approximately 74,500 sf. Currently, the Performing Arts Building houses the University's Department of Theatre Arts and Music programs; the University anticipates the facility to be occupied during construction. The goal of the project is to address safety, accessibility and code compliancy all while addressing space utilization by increasing the capacity to accommodate additional students, staff and community members. This State funded expansion and renovation project has been divided into two phases. The first already completed expansion phase, was the construction of a new theatre across campus from the existing building. This second renovation phase will address the existing building deficiencies, including acoustical, accessibility and aesthetic. Incorporated into this project will be the mechanical work necessary to connect the Moss Performing Arts Center building to the campus geo exchange system. Question Deadline 8/29/24 at 11:00 AM MT Questions are submitted online Yes Anticipated Construction Start/Finish 11/01/2024 - 08/01/2025 This State funded expansion and renovation project has been divided into two phases. The first already completed expansion phase, was the construction of a new theatre across campus from the existing building. This second renovation phase will address the existing building deficiencies, including acoustical, accessibility and aesthetic. Incorporated into this project will be the mechanical work necessary to connect the Moss Performing Arts Center building to the campus geo exchange system. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information

60 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects