Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

November 19, 2024

June 17, 2025

Multiple Locations

Renovation, Site Work

No Information to Display

$1,250,000.00

Public - City

img_map_placeholder

Multiple Locations, Texas City, TX

25

19

12

3

Subscribe to View Full Documents

The project involves construction of approximately 145 linear feet of sheet piling lining the outfall of Rainwater pump station 'A' and approximately 100 linear feet of sheet piling lining the outfall of Rainwater pump station 'B'. Construction also includes the replacement of the existing handrail, removal and replacement of existing concrete channel lining to facilitate sheet piling installation, and installation and removal of coffer dams to facilitate the sheet pile construction. Bid security in the amount of five (5) percent of the greatest amount bid must accompany each bid. The bid security must be in the form of a Bid Bond. Upon consideration of the proposals the City Commission plans to award a Contract; however the Owner reserves the right to reject any and all bids, to waive any and all formalities and technicalities, and to accept any bid which it deems advantageous to the owner. Each bidder agrees to waive any claim it has or may have against the Owner, the Engineer, and their respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. The successful bidder will be required to furnish a performance bond and payment bond in an amount of 100% of the total contract price. The construction covered by the contract documents shall commence within ten (10) days after written Notice to Proceed shall have been given by Professional and be completed within 210 calendar days from the date specified in the Notice to Proceed. Upon consideration of the proposals the City Commission plans to award a Contract; however the Owner reserves the right to reject any and all bids, to waive any and all formalities and technicalities, and to accept any bid which it deems advantageous to the owner. Question Deadline 09/04/2024 Bidders desiring additional information or clarification of technical specifications, plans or other documents must make written requests for such information to the Professional as the Owner's representative prior to 96 hours before the deadline specified for receipt of bids. A. Pump Station A: Work of the contract is for installation of approximately 145 linear feet of steel sheet pilings driven to approximately 15-30 feet deep including the pile cap and railing; as well as the removal and replacement of 70 square yards of discharge channel concrete including placement of a seal slab. The project also includes installation and removal of coffer dam to facilitate the sheet pile construction. B. Pump Station B: Work of the contract is for installation of approximately 100 linear feet of steel sheet pilings driven to approximately 20-30 feet deep including the pile cap and railing; as well as the removal and replacement of 40 square yards of discharge channel concrete including placement of a seal slab. The project also includes installation and removal of coffer dam to facilitate the sheet pile construction.

35 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.